+38 (097) 842 08 34
MON-FRI from 9:00 to 17:00
EN
UA RU
Services
Consulting
Effective tools for increasing project profitability
Business plan and concept
Designing
Construction
Development
Cooperation in the development of development projects
Management
For owners of all types of hotel facilities
Purchase/Sell
For owners of hotel facilities
Marketing and Booking
To increase hotel sales
Hotel Check-up
Comprehensive diagnostics for the prosperity of your business
Directions
Investments in Ukraine
From $10,000 into a profitable hotel property
Hotel chain
Dive into the magic of travel with Ribas Hotels
Investments abroad
Hotel business in Europe and Asia
Book “More than a service”
A book that will change the way you think about service
Hotel design
Hotel interior design
About us Our objects Analytics Blog Contacts
EN
UA RU
Construction
by Ribas
Hotel creation is a laborious process that requires knowledge of hotel business management.

For the successful organization of the construction of the hotel, development of the architectural concept and business plan of the project, you should deal with the professionals.

Ribas Hotel Group experts will help you build an exclusive profitable hotel!
Contact us
Filling error
Types of projects being implemented
  • City hotels
  • Resort hotels
  • Investment projects

We work on every project in a comprehensive manner. We create hotel property, and carry out both reconstruction or construction. We develop three and four star hotels, resort, beach, ski hotels, and also apart-hotels.

 

For investors
The estimate
For investors

The estimate for the construction of the hotel is a document on the basis of which a plan and schedule of work is drawn up. A correctly made estimate will allow you:

  • To control the timing. The estimate documents the deadline for each stage of construction.
  • To predict costs. The estimate includes the cost of the land plot, building materials, contractors’ work, transportation costs and much more.
  • To plan the process. When drawing up an estimate, the most optimal procedure for carrying out construction work is calculated.
For investors
Construction audit
For investors

The owner of the facility does not need to independently establish and monitor processes, organize work, and be responsible for mistakes. We will help in organizing the construction site, arrange the supply of construction, monitor the progress of installation and finishing works, and draw up as-built documentation.

In order to optimize the construction process, avoid force majeure and reduce costs, we engage licensed experts to audit construction activities. Specialists will assess the feasibility of costs and technical solutions, check the design and technical documentation.

This helps prevent builders from making mistakes, adhere to agreed deadlines and guarantee a high-quality construction.

As a result of cooperation with Ribas Hotels Group, you get:
  • Assistance in organizing a construction site;
  • Ensuring the construction supplies;
  • Control of installation work;
  • Drawing up as-built documentation;
  • Monitoring of finishing works.
Why Choose Ribas Hotels Group
  • Return on investment

When building a hotel from scratch, we guarantee a return on investment with further comprehensive management.

  • Business plan for 5 years

When launching a hotel, we provide the owner with a working business plan.

  • High standards

In hotels built by Ribas Hotels Group, every m² is profitable.

  • Fast payback

The hotels we build pay off twice as fast.

Project examples
Frequently asked questions
All
When is the best time to start construction?

We recommend that the main part of the construction should be carried out in late spring or early fall - laying the foundation and foundation, stretching the building in height.

In the winter season, it is advisable to rebuild the future hotel from the inside, and with the onset of the warm season, start the exterior decoration.

Following our approach, you get a complete facility without downtime, without spending extra money and time.

What is better - to build a hotel from scratch or to reconstruct an old building?

When building from scratch, you can achieve much higher quality and reliability of the building and its internal systems. During the construction of a hotel, you will not have to deal with correcting someone else's mistakes made during the construction phase, as you would during a reconstruction.

When creating a new building, it is more realistic to build it correctly, in accordance with all applicable building codes and regulations, than during reconstruction.

How to calculate the cost of construction?

At the initial stage, the cost calculation is based on the area of the hotel and its functionality. During the preparation of the work plan, the budget is detailed - the cost of building materials and components, the scope of work is specified. When planning the budget, it is imperative to take into account the overall concept of the project - if it is an eco-hotel, then the most natural materials are selected, if you need to emphasize status, we use expensive materials and exclusive design solutions.

Why is it profitable to invest in hotel construction?

Investing in the hotel business has many advantages:

1. Reliable investment. Investments pay off within 7-15 years.
2. Capitalization growth. A successful hotel grows in value as a real estate object.
3. Image. Hotel and restaurant owners sometimes use their hotel as a place for business meetings.

Contact us
Filling error
Ukraine

Odesa, 25 Lesya Ukrainka Avenue
Lviv, 6 D. Danylyshyna Street
Kyiv, 2 Nezalezhnosti Square, Spaces

+38 (097) 842-08-34

Poland

126, Marszalkowska Centre, Marszałkowska 134, 00-008 Warszawa

+447488817906

Bali

Jl. Raya Sanggingan No. 89, Ubud, Kedewatan, Kec. Gianyar, Kabupaten Gianyar, Bali 80571

+38 (098) 414-36-67

United Kingdom

27 Old Gloucester Street, London, United Kingdom, WC1N 3AX

+447488817906